15th December – Pre-Christmas Progress
Things have been moving ahead on the building front, thanks in part to a spell of drier weather. After a lot of preparation, the basement slab has been poured at last. TJ and his crew were very busy all week on site, pouring concrete and stamping (putting a lightly patterned coloured surface onto the concrete […]
15th December – Pre-Christmas Progress Read More »